BESS B+C — Two SPVs

20 MW / 70 MWh (2 × 35 MWh) · Distribution node · Planning stage · Kyustendil cluster

Single land parcel · two grid connection points · turnkey delivery

BESS B+C — 70 MWh / 20 MW

Twin SPVs on one parcel

BESS B and BESS C are implemented as two separate SPVs, each 35 MWh / 10 MW, on a single land parcel with two grid connection points into the same substation — 70 MWh / 20 MW combined. The sites are in the Kyustendil corridor alongside BESS A and BESS D, sharing regional O&M and optimisation logic. Status: planning. Commercial timing follows permitting and equipment schedules documented in investor materials.

Qualified investors

Economics, PPA-style scenarios, and fixed-price terms are provided in the Investor Tools portal. This page is non-numeric by design.

Highlights

  • Flexible investment: Participate in one SPV or both.
  • Cluster synergies: Shared corridor with BESS A/D and common dispatch philosophy (EPO).
  • Turnkey: ZiRi delivers permitting, build, and commissioning path under agreed terms.
Conceptual visualization of ZiRi BESS B+C projects

Key parameters

  • Per SPV: 35 MWh installed, 10 MW
  • Combined: 70 MWh, 20 MW
  • Usable (approx.): ~32 MWh per SPV (~64 MWh combined)
  • Grid: Distribution-connected node (cluster)
  • Location: Kyustendil, Bulgaria
  • Technology: LFP, tier-1 supply chain

Technical specifications

Parameter Specification
Structure2 SPVs (BESS B + BESS C), 35 MWh / 10 MW each
Battery technologyLithium Iron Phosphate (LiFePO4)
Installed energy70 MWh total (~64 MWh usable combined)
Power20 MW total
GridDistribution node — dual connections, one parcel
StatusPlanning

Swipe to see all specifications

Market context

The same IBEX-linked optimisation stack applies as for the wider portfolio. No forward-looking financial numbers on this public page. PPA-style scenario pages remain in the authenticated investor area.

IBEX: ibex.bg · Products: products traded