BESS B+C — Two SPVs
20 MW / 70 MWh (2 × 35 MWh) · Distribution node · Planning stage · Kyustendil cluster
Single land parcel · two grid connection points · turnkey delivery
BESS B+C — 70 MWh / 20 MW
Twin SPVs on one parcel
BESS B and BESS C are implemented as two separate SPVs, each 35 MWh / 10 MW, on a single land parcel with two grid connection points into the same substation — 70 MWh / 20 MW combined. The sites are in the Kyustendil corridor alongside BESS A and BESS D, sharing regional O&M and optimisation logic. Status: planning. Commercial timing follows permitting and equipment schedules documented in investor materials.
Qualified investors
Economics, PPA-style scenarios, and fixed-price terms are provided in the Investor Tools portal. This page is non-numeric by design.
Highlights
- Flexible investment: Participate in one SPV or both.
- Cluster synergies: Shared corridor with BESS A/D and common dispatch philosophy (EPO).
- Turnkey: ZiRi delivers permitting, build, and commissioning path under agreed terms.
Key parameters
- Per SPV: 35 MWh installed, 10 MW
- Combined: 70 MWh, 20 MW
- Usable (approx.): ~32 MWh per SPV (~64 MWh combined)
- Grid: Distribution-connected node (cluster)
- Location: Kyustendil, Bulgaria
- Technology: LFP, tier-1 supply chain
Technical specifications
| Parameter | Specification |
|---|---|
| Structure | 2 SPVs (BESS B + BESS C), 35 MWh / 10 MW each |
| Battery technology | Lithium Iron Phosphate (LiFePO4) |
| Installed energy | 70 MWh total (~64 MWh usable combined) |
| Power | 20 MW total |
| Grid | Distribution node — dual connections, one parcel |
| Status | Planning |
Swipe to see all specifications
Market context
The same IBEX-linked optimisation stack applies as for the wider portfolio. No forward-looking financial numbers on this public page. PPA-style scenario pages remain in the authenticated investor area.
IBEX: ibex.bg · Products: products traded