BESS D — Cluster Storage
10 MW / 40 MWh · Existing substation · Permitted · Design phase — target COD per portfolio timeline
Kyustendil cluster | EPO-managed dispatch stack
BESS D — 40 MWh / 10 MW
Fast-cycle project at existing substation
BESS D is a 10 MW / 40 MWh system (approximately 36 MWh usable) tied to an existing substation in the Kyustendil corridor. It is permitted and in design, sequenced to align with equipment lead times and cluster construction. Together with BESS A, BESS B+C, and shared grid infrastructure, it forms part of ZiRi's co-located storage portfolio. Public information stays qualitative; economics and terms are in the investor portal.
Qualified investors
Investment memorandum and SPV materials are available after login. No financial projections on this page.
Key parameters
- Installed energy: 40 MWh (LiFePO4)
- Usable (approx.): ~36 MWh
- Power: 10 MW bi-directional
- Duration at full power: 4 hours
- Grid: Existing substation / distribution node (cluster)
- Status: Permitted; engineering and procurement in progress
Technical specifications
| Parameter | Specification |
|---|---|
| Technology | LiFePO4 |
| Installed / usable | 40 MWh / ~36 MWh |
| Power | 10 MW |
| Grid | Existing substation (cluster) |
| Location | Kyustendil, Bulgaria |