Integrated Data Center and BESS
An AI training and batch-compute facility powered by an integrated 400 MWh battery energy storage system.
Integrated Data Center and Battery Energy Storage System (400 MWh)
Energy-Optimized Infrastructure
The project leverages Bulgaria’s unique energy market conditions. The 400 MWh BESS is designed to charge during periods of low-cost renewable surplus, a pattern regularly observed on the Independent Bulgarian Energy Exchange (IBEX). With a 120 MW grid connection, the system can charge storage during the lowest-price hours, and the data center draws primarily from storage, which is intended to lower the blended electricity cost for a 15 MW IT load. This integration is designed to reduce operating costs and support competitive delivery of AI training and batch compute services in the EU.
Investment Highlights:
- Energy Cost Position: Uses low power prices driven by renewable surplus to pursue long-term cost efficiency relative to European peers.
- AI Workload Fit: The primary target workloads are AI model training, fine-tuning, rendering, and other latency-insensitive activities. This makes location away from major financial hubs not a disadvantage—while still benefiting from strong backbone connectivity for data movement and customer access.
- Strategic Location: Optimized for power availability, expansion potential, and cost discipline—while serving EU customers that value predictable capacity, EU jurisdiction, and bulk throughput over ultra-low latency.
Key Parameters:
- Storage Capacity: 400 MWh BESS
- Data Center IT Load: 15 MW continuous (24/7)
- Location: Kyustendil, Bulgaria