Projects

Integrated Data Center and BESS

An AI training and batch-compute facility powered by an integrated 400 MWh battery energy storage system.

Integrated Data Center and Battery Energy Storage System (400 MWh)

Energy-Optimized Infrastructure

The project leverages Bulgaria’s unique energy market conditions. The 400 MWh BESS is designed to charge during periods of low-cost renewable surplus, a pattern regularly observed on the Independent Bulgarian Energy Exchange (IBEX). With a 120 MW grid connection, the system can charge storage during the lowest-price hours, and the data center draws primarily from storage, which is intended to lower the blended electricity cost for a 15 MW IT load. This integration is designed to reduce operating costs and support competitive delivery of AI training and batch compute services in the EU.

Investment Highlights:

  • Energy Cost Position: Uses low power prices driven by renewable surplus to pursue long-term cost efficiency relative to European peers.
  • AI Workload Fit: The primary target workloads are AI model training, fine-tuning, rendering, and other latency-insensitive activities. This makes location away from major financial hubs not a disadvantage—while still benefiting from strong backbone connectivity for data movement and customer access.
  • Strategic Location: Optimized for power availability, expansion potential, and cost discipline—while serving EU customers that value predictable capacity, EU jurisdiction, and bulk throughput over ultra-low latency.
Conceptual visualization of ZiRi's Integrated Data Center and 400 MWh BESS

Key Parameters:

  • Storage Capacity: 400 MWh BESS
  • Data Center IT Load: 15 MW continuous (24/7)
  • Location: Kyustendil, Bulgaria

Financial models and detailed business cases are available upon request.